Hotels under construction: how to sell furniture and equipment to hotel projects

A record pipeline of 2.43 million rooms, furniture value per room, buyers and timing: how to sell FF&E and OS&E to hotels under construction around the world.

Vextrado editorial teamPublished on 13 October 20266 min read

Key points

  • The global hotel construction pipeline reached a record 15,976 projects and 2,433,948 rooms at the end of the second quarter of 2026, of which 1,043,290 rooms were already under construction (Lodging Econometrics).
  • At the benchmark of $27,785 of furniture and decorative fit-out per room (European 4- and 5-star hotels, 2022 estimate), a 200-room project represents around $5.6 million.
  • Furniture is decided during design and the mock-up rooms, well before opening: a supplier who turns up at the inauguration arrives after the orders have been placed.

To sell furniture and equipment to a hotel under construction, you need to identify the project during its design phase, well before opening, and convince both those who specify (interior designer, brand) and those who buy (owner, purchasing agent, fit-out contractor). The opportunity is unprecedented: 15,976 projects and 2,433,948 rooms were in the global pipeline at the end of the second quarter of 2026, according to Lodging Econometrics (Hospitality Net, 20 August 2026). With a benchmark of $27,785 of furniture and decorative fit-out per room, estimated in 2022 for European 4- and 5-star hotels (TOPHOTELNEWS, 22 February 2022), a 200-room hotel represents around $5.6 million.

How many hotels are under construction worldwide in 2026?

Lodging Econometrics classifies each project by stage, which makes it possible to measure the real opportunity and not just announcements. At the end of June 2026, the global pipeline broke down as follows (Hospitality Net, 20 August 2026):

  • under construction: 6,174 projects and 1,043,290 rooms;
  • scheduled to start construction within 12 months: 3,743 projects and 530,326 rooms;
  • early planning: 6,059 projects and 860,332 rooms.

The flow is continuous. In the second quarter of 2026 alone, 974 new projects (138,743 rooms) were announced and 602 projects (83,232 rooms) broke ground. After 2,438 openings in 2025, the firm forecasts 2,742 in 2026 and 2,590 in 2027. Renovations and rebrandings, which also renew furniture, account for a further 3,760 projects and 521,849 rooms (Hospitality Net, 20 August 2026).

Where are hotel projects concentrated?

Region Projects Rooms Source
World 15,976 2,433,948 Lodging Econometrics, Q2 2026
Middle East 724 178,003 Lodging Econometrics, Q2 2026
of which Saudi Arabia 387 105,648 Lodging Econometrics, Q2 2026
Riyadh / Jeddah / Mecca 106 / 62 / 34 21,666 / 14,435 / 21,689 Lodging Econometrics, 13 August 2026
India 1,033 137,601 Lodging Econometrics, Q2 2026
Africa (Lodging Econometrics method) 343 52,526 Lodging Econometrics, Q2 2026
Africa, chain hotels (W Hospitality method) 675 123,846 W Hospitality Group, 10 March 2026
of which Egypt 185 45,984 W Hospitality Group, 10 March 2026
of which Morocco 75 10,606 W Hospitality Group, 10 March 2026

The two African sources do not measure the same scope and cannot be added together.

In the Middle East, 46% of the pipeline is under construction (330 projects and 82,353 rooms), and the region expects 83 openings in 2026 and 91 in 2027 (Lodging Econometrics, 13 August 2026). In Africa, Egypt expects 33 openings in 2026, and nearly 80% of the rooms in the pipeline in Ethiopia and Kenya are already under construction (W Hospitality Group, 10 March 2026).

The Gulf figures date from the end of June 2026 and should be read with caution. In the third quarter of 2026, construction contracts awarded in the Gulf Cooperation Council countries fell by 44.7% year on year (GDN Online / Kamco, 7 October 2026), and the IMF forecasts a 3.3% contraction of the Saudi economy in 2026 (The National, 13 October 2026). Before investing sales time, confirm that the site is active and that the opening date is holding.

What does a 200-room project represent for a supplier?

Two families of purchases can be distinguished. FF&E (furniture, fixtures and equipment) covers furniture, lighting and durable equipment, such as beds or sofas. OS&E (operating supplies and equipment) covers regularly replaced operating supplies: linen, tableware, guest amenities (TOPHOTELPROJECTS, 3 September 2026).

The public cost-per-room benchmark used here dates from 2022. At the time, TOPHOTELPROJECTS estimated the FF&E demand of European 4- and 5-star hotels in the pipeline at $8.14 billion, or $27,785 per room for 292,880 rooms. Its scope covers loose furniture, decorative lighting, curtains, accessories, artwork and rugs (TOPHOTELNEWS, 22 February 2022).

Applied to a 200-room hotel, this benchmark gives around $5.6 million (200 × $27,785). Three caveats apply:

  • it is an extrapolation from a 2022 European upscale average, not a quotation;
  • the scope excludes OS&E, commercial kitchens and fixed joinery;
  • the amount is split across many packages, and a manufacturer of lighting or textiles targets only a fraction of it.

The order of magnitude is nonetheless enough to justify a targeted prospecting effort on a few well-qualified projects rather than a broad mailing.

Who decides on and who pays for the furniture?

A hotel project brings together several players, and the sale is rarely won with just one of them:

  • the owner or developer finances the hotel and signs or delegates the orders;
  • the brand (the operator), when it manages or franchises the hotel, imposes its brand standards and approves choices;
  • the interior designer specifies the models, finishes and materials;
  • the purchasing agent, appointed by the owner, consults suppliers, compares bids and places orders;
  • the fit-out contractor produces and installs the joinery, and sometimes the furniture as well.

Industry consultants cite interior designers, general contractors, procurement teams, suppliers, installers, purchasing agents and hospitality consultants among the players to be coordinated (Hospitality Net, 12 December 2024). FF&E is handled mainly by architects, designers and furniture suppliers, OS&E by procurement and operations teams (TOPHOTELPROJECTS, 3 September 2026). For a manufacturer, the objective is therefore twofold: to be specified by the interior designer and listed by the purchasing agent.

At what stage of the project should you make contact?

FF&E comes into play early, from the design stage, then during construction and pre-opening; OS&E becomes central during pre-opening (TOPHOTELPROJECTS, 3 September 2026). Producing the mock-up rooms alone takes 4 to 6 months and must precede the large orders (eHotelier, 16 January 2025). One professional guide places the selection of purchasing partners 12 to 18 months before the deadline, order confirmation 9 to 12 months before and delivery one month before opening (Almo Pro AV, 27 March 2023).

Project stage What is decided Priority contact Supplier action
Early planning Concept, brand, choice of architect Developer, architect Get known, comparable references
Construction start within 12 months Interior design, budget, mock-up rooms Interior designer, purchasing agent Samples, indicative prices, lead times
Under construction Tenders and orders Purchasing agent, fit-out contractor Firm offer, manufacturing and delivery schedule
Pre-opening OS&E, top-ups Procurement and operations teams Linen, tableware, small equipment
Renovation or rebranding Furniture replacement Owner, brand Same approach, on an existing building

Which sources should be used to identify projects?

The most useful sources publish their summaries free of charge, while project-by-project detail is usually part of paid offerings:

  • Lodging Econometrics quarterly reports, by region and by stage;
  • W Hospitality Group's annual report on chain hotels in Africa, published in March;
  • the TOPHOTELPROJECTS project database;
  • signing announcements from hotel groups and the local press: 974 new projects were announced worldwide in the second quarter of 2026 alone (Hospitality Net, 20 August 2026).

An announcement is only a signal. Before any approach, a useful project file answers six questions: who the owner is, which brand, what stage, what opening date, which interior designer, which purchasing agent. And it states the date it was last checked.

Frequently asked questions

What is the difference between FF&E and OS&E in a hotel?+

FF&E (furniture, fixtures and equipment) covers furniture, lighting and durable equipment, bought during construction. OS&E (operating supplies and equipment) covers regularly replaced operating supplies, such as linen, tableware or guest amenities, bought mainly before opening.

How much is the furniture in a 200-room hotel worth?+

Using the benchmark of $27,785 per room estimated in 2022 for European 4- and 5-star hotels, a 200-room hotel represents around $5.6 million of furniture, decorative lighting, curtains, accessories, artwork and rugs. This is an order of magnitude, which varies by segment, region and year.

When should you contact a hotel project to sell furniture?+

Before purchasing starts, during interior design and the production of mock-up rooms. One professional guide places the selection of purchasing partners 12 to 18 months before the deadline and order confirmation 9 to 12 months before.

Who buys a hotel's furniture: the owner or the hotel chain?+

The owner pays. The brand imposes its brand standards when it manages or franchises the hotel, the interior designer specifies the models, and the purchasing agent appointed by the owner consults suppliers and places the orders.

Sources

  1. Hospitality Net / Lodging Econometrics, pipeline mondial de construction hôtelière au T2 2026 · 20 Aug 2026
  2. Lodging Econometrics, Middle East hotel construction pipeline Q2 2026 · 13 Aug 2026
  3. Hospitality Net / W Hospitality Group, pipeline hôtelier africain 2026 · 10 Mar 2026
  4. TOPHOTELNEWS, « Europe's hotels will need $8.14bn of FF&E » · 22 Feb 2022
  5. TOPHOTELPROJECTS, « Understanding FF&E and OS&E: a guide with FAQ » · 3 Sept 2026
  6. Hospitality Net / Cayuga Hospitality Consultants, « How to avoid common FF&E scheduling pitfalls » · 12 Dec 2024
  7. eHotelier / Cayuga Hospitality Consultants, « Key considerations for FF&E scheduling in hotel development » · 16 Jan 2025
  8. Almo Pro AV, « How To: FF&E Budgeting » · 27 Mar 2023
  9. GDN Online / Kamco Invest, attributions de contrats dans le CCG au T3 2026 · 7 Oct 2026
  10. The National, prévisions de croissance du FMI pour les économies du Golfe · 13 Oct 2026

General information, current as of the date shown; not legal, tax or customs advice.